GPU-backed loans: the terms borrowers and lenders published

16 GPU-backed financings as the borrower, lender or counsel announced them, with the amount, pricing and security wherever the announcement states them, read 8 October 2026.

16 financings GPU-backed financings read across 17 announcements, 8 Oct 2026
15 of 16 Amount: the facility size as announced, in millions of US dollars the commonest of 2 answers
10 of 16 Structure: a credit or debt facility the commonest of 4 answers
7 of 16 Rate or spread, in its words: stated the financings that put it in writing in their announcements, each quoted below
7 of 16 What secures it: the GPUs and customer contracts or their cash flows the commonest of 4 answers
6 of 16 Maturity or tenor, in its words: stated the financings that put it in writing in their announcements, each quoted below
17 Announcements examined 29 named; each answer carries its date and a hash

Amount

  1. the facility size as announced, in millions of US dollars15 financings
  2. not stated1 financing
Each of 16 financings answers once.
Counts
RowValue
the facility size as announced, in millions of US dollars15 financings
not stated1 financing

Structure

  1. a credit or debt facility10 financings
  2. a delayed draw term loan4 financings
  3. a private placement and term loan1 financing
  4. a term loan1 financing
Each of 16 financings answers once.
Counts
RowValue
a credit or debt facility10 financings
a delayed draw term loan4 financings
a private placement and term loan1 financing
a term loan1 financing

Rate or spread, in its words

  1. not stated9 financings
  2. stated7 financings
Each of 16 financings answers once.
Counts
RowValue
not stated9 financings
stated7 financings

What secures it

  1. the GPUs and customer contracts or their cash flows7 financings
  2. the GPUs alone4 financings
  3. not stated4 financings
  4. customer contracts1 financing
Each of 16 financings answers once.
Counts
RowValue
the GPUs and customer contracts or their cash flows7 financings
the GPUs alone4 financings
not stated4 financings
customer contracts1 financing

Maturity or tenor, in its words

  1. not stated10 financings
  2. stated6 financings
Each of 16 financings answers once.
Counts
RowValue
not stated10 financings
stated6 financings

How every financing answered

One financing to a row. Expand an answer for its source sentence, word for word, plus the announcement and the read date; "not stated" means that announcement does not cover the question.

FinancingAmountStructureRate or spread, in its wordsWhat secures itMaturity or tenor, in its words
Alpha Compute $31.9M non-recourse GPU loan (2026)
31.9 USD million

a binding term sheet for a $31.9 million non-recourse loan facility secured by B300 Nvidia graphics processing units Alpha Compute release via Nasdaq

a credit or debt facility

Structure: Non-recourse senior secured loan facility Alpha Compute release via Nasdaq

not stated

Not addressed in Alpha Compute release via Nasdaq

the GPUs alone

the collateral is strictly limited to the underlying Nvidia GPU assets and the facility's build-out Alpha Compute release via Nasdaq

not stated

Not addressed in Alpha Compute release via Nasdaq

CoreWeave $2.6B DDTL 5.5 (2026)
2600 USD million

today announced it has closed its $2.6 billion delayed draw term loan facility CoreWeave release, DDTL 5.5

a delayed draw term loan

it has closed its $2.6 billion delayed draw term loan facility CoreWeave release, DDTL 5.5

attracting exceptional investor demand, and priced at SOFR + 5.50%

attracting exceptional investor demand, and priced at SOFR + 5.50% CoreWeave release, DDTL 5.5

customer contracts

Facility is backed by a diverse group of leading AI, financial services, and technology customers CoreWeave release, DDTL 5.5

the DDTL 5.5 Facility carries an approximate five-year maturity while its underlying…

the DDTL 5.5 Facility carries an approximate five-year maturity while its underlying customer contracts average approximately three years in length CoreWeave release, DDTL 5.5

CoreWeave $7.5B debt financing facility (2024)
7500 USD million

it has signed a definitive agreement for a $7.5 billion debt financing facility led by funds managed by Blackstone Blackstone release, CoreWeave $7.5B

it has signed a definitive agreement for a $7.5 billion debt financing facility led by funds managed by Blackstone CoreWeave release, $7.5B facility

a credit or debt facility

a $7.5 billion debt financing facility led by funds managed by Blackstone Blackstone release, CoreWeave $7.5B

a $7.5 billion debt financing facility led by funds managed by Blackstone CoreWeave release, $7.5B facility

not stated

Not addressed in Blackstone release, CoreWeave $7.5B

Not addressed in CoreWeave release, $7.5B facility

not stated

Not addressed in Blackstone release, CoreWeave $7.5B

Not addressed in CoreWeave release, $7.5B facility

not stated

Not addressed in Blackstone release, CoreWeave $7.5B

Not addressed in CoreWeave release, $7.5B facility

CoreWeave $8.5B DDTL 4.0 (2026)
8500 USD million

today announced it has closed an $8.5 billion delayed draw term loan facility CoreWeave release, DDTL 4.0

a delayed draw term loan

it has closed an $8.5 billion delayed draw term loan facility CoreWeave release, DDTL 4.0

The facility includes a floating rate tranche financed at SOFR + 2.25% and a fixed rate…

The facility includes a floating rate tranche financed at SOFR + 2.25% and a fixed rate tranche financed at approximately 5.9%. CoreWeave release, DDTL 4.0

the GPUs and customer contracts or their cash flows

the first investment-grade rated financing secured by HPC infrastructure and an associated customer contract CoreWeave release, DDTL 4.0

The DDTL 4.0 Facility matures in March 2032

The DDTL 4.0 Facility matures in March 2032 CoreWeave release, DDTL 4.0

Crusoe $225M credit facility from Upper90 (2025)
225 USD million

announced today the closing of an approximately $225 million credit facility for Crusoe Crusoe newsroom, Upper90 credit facility

a credit or debt facility

the closing of an approximately $225 million credit facility for Crusoe Crusoe newsroom, Upper90 credit facility

not stated

Not addressed in Crusoe newsroom, Upper90 credit facility

not stated

Not addressed in Crusoe newsroom, Upper90 credit facility

not stated

Not addressed in Crusoe newsroom, Upper90 credit facility

Firmus US$10bn debt facility (2026)
10000 USD million

it has secured a US$10 billion debt financing facility led by funds managed by Blackstone Firmus newsroom, US$10bn financing

a credit or debt facility

it has secured a US$10 billion debt financing facility led by funds managed by Blackstone Firmus newsroom, US$10bn financing

not stated

Not addressed in Firmus newsroom, US$10bn financing

not stated

Not addressed in Firmus newsroom, US$10bn financing

not stated

Not addressed in Firmus newsroom, US$10bn financing

Fluidstack senior debt facility from Macquarie
not stated

Not addressed in Macquarie case page, Fluidstack

a credit or debt facility

Macquarie structured and closed a senior debt facility for Fluidstack, secured by the GPUs themselves Macquarie case page, Fluidstack

not stated

Not addressed in Macquarie case page, Fluidstack

the GPUs alone

a senior debt facility for Fluidstack, secured by the GPUs themselves Macquarie case page, Fluidstack

not stated

Not addressed in Macquarie case page, Fluidstack

IREN $3.65bn GPU financing (2026)
3650 USD million

today announced it has closed a $3.65bn investment-grade GPU financing facility IREN release, $3.65bn GPU financing

a private placement and term loan

The financing comprises a $2.10bn U.S. private placement at a fixed rate equivalent to SOFR+2.13% IREN release, $3.65bn GPU financing

a $1.55bn delayed draw term loan at a floating rate of SOFR+2.25%

a $1.55bn delayed draw term loan at a floating rate of SOFR+2.25% IREN release, $3.65bn GPU financing

the GPUs and customer contracts or their cash flows

The facility is secured against the GPUs and associated contracted cash flows. IREN release, $3.65bn GPU financing

not stated

Not addressed in IREN release, $3.65bn GPU financing

Lambda $1B fixed-rate delayed draw term loan (2026)
1000 USD million

today announced the closing of a $1 billion investment-grade, delayed draw term loan Lambda release, $1B fixed-rate financing

a delayed draw term loan

the closing of a $1 billion investment-grade, delayed draw term loan Lambda release, $1B fixed-rate financing

enabled pricing inside the target pricing range of a 6.78% fixed interest rate

enabled pricing inside the target pricing range of a 6.78% fixed interest rate Lambda release, $1B fixed-rate financing

the GPUs and customer contracts or their cash flows

Secured by the GPU servers and related infrastructure funded by the Facility and the contracted cash flows Lambda release, $1B fixed-rate financing

Facility final maturity of May 30, 2033, with a fully amortizing repayment profile

Facility final maturity of May 30, 2033, with a fully amortizing repayment profile Lambda release, $1B fixed-rate financing

Lambda $1B senior secured credit facility (2026)
1000 USD million

today announced the closing of a $1 billion syndicated senior secured credit facility Lambda release, $1B credit facility

a credit or debt facility

the closing of a $1 billion syndicated senior secured credit facility Lambda release, $1B credit facility

not stated

Not addressed in Lambda release, $1B credit facility

not stated

Not addressed in Lambda release, $1B credit facility

not stated

Not addressed in Lambda release, $1B credit facility

Lambda $926M term loan B (2026)
926 USD million

today announced the closing of its $926 million senior secured term loan B facility Lambda release, $926M term loan B

a term loan

its $926 million senior secured term loan B facility Lambda release, $926M term loan B

The Facility was priced at SOFR + 3.00%, and issued at 99.5% of the principal amount.

The Facility was priced at SOFR + 3.00%, and issued at 99.5% of the principal amount. Lambda release, $926M term loan B

the GPUs and customer contracts or their cash flows

It is secured by the GPU servers and related infrastructure funded through the transaction and the cash flows those assets generate. Lambda release, $926M term loan B

The Facility matures December 31, 2030, on a fully amortizing schedule

The Facility matures December 31, 2030, on a fully amortizing schedule Lambda release, $926M term loan B

Nebius $775M secured debt facility (2026)
775 USD million

it has entered into its first senior secured debt facility for approximately $775 million Nebius release, first secured debt financing

a credit or debt facility

it has entered into its first senior secured debt facility for approximately $775 million Nebius release, first secured debt financing

The facility matures October 31, 2030, and is priced at SOFR + 2.50%.

The facility matures October 31, 2030, and is priced at SOFR + 2.50%. Nebius release, first secured debt financing

the GPUs and customer contracts or their cash flows

The vehicle is backed by deployed GPU infrastructure and contracted cash flows from an agreement with an investment-grade customer. Nebius release, first secured debt financing

The facility matures October 31, 2030, and is priced at SOFR + 2.50%.

The facility matures October 31, 2030, and is priced at SOFR + 2.50%. Nebius release, first secured debt financing

NexGen Cloud $34M facility from USD.AI (2026)
34 USD million

it has provided a $34 million, three-year debt facility to fund the deployment NexGen Cloud news, USD.AI facility

a credit or debt facility

it has provided a $34 million, three-year debt facility to fund the deployment NexGen Cloud news, USD.AI facility

not stated

Not addressed in NexGen Cloud news, USD.AI facility

the GPUs and customer contracts or their cash flows

secured by the GPUs and the contractual cashflows they generate NexGen Cloud news, USD.AI facility

The three-year, non-recourse facility will fund large-scale NVIDIA B200 GPU fleet

The three-year, non-recourse facility will fund large-scale NVIDIA B200 GPU fleet NexGen Cloud news, USD.AI facility

Nscale $1.4bn GPU delayed draw term loan (2026)
1400 USD million

today announced it has signed a USD $1.4 billion Delayed Draw Term Loan backed by GPUs Nscale release, GPU DDTL

a delayed draw term loan

it has signed a USD $1.4 billion Delayed Draw Term Loan backed by GPUs Nscale release, GPU DDTL

not stated

Not addressed in Nscale release, GPU DDTL

the GPUs alone

a USD $1.4 billion Delayed Draw Term Loan backed by GPUs Nscale release, GPU DDTL

not stated

Not addressed in Nscale release, GPU DDTL

QumulusAI $500M non-recourse facility through USD.AI (2025)
500 USD million

today announced a $500 million non-recourse financing facility arranged by Permian Labs QumulusAI release via Newswire

a credit or debt facility

a $500 million non-recourse financing facility arranged by Permian Labs and distributed through the USD.AI Protocol QumulusAI release via Newswire

not stated

Not addressed in QumulusAI release via Newswire

the GPUs alone

Permian Labs issues GPU Warehouse Receipt Tokens (GWRTs), and USD.AI serves as the on-chain DeFi protocol that enables those tokens to be used as collateral QumulusAI release via Newswire

not stated

Not addressed in QumulusAI release via Newswire

SharonAI US$356m GPU-backed SPV facility (2026)
356 USD million

its inaugural US$356m committed senior secured, GPU-backed SPV debt facility SharonAI 8-K exhibit 99.1

a credit or debt facility

its inaugural US$356m committed senior secured, GPU-backed SPV debt facility SharonAI 8-K exhibit 99.1

priced at a fixed rate of 9.95%, excluding fees

priced at a fixed rate of 9.95%, excluding fees SharonAI 8-K exhibit 99.1

the GPUs and customer contracts or their cash flows

The facility will be secured against the GPUs and associated cash flows SharonAI 8-K exhibit 99.1

not stated

Not addressed in SharonAI 8-K exhibit 99.1

Quoted wording for all 85 answers
  • Alpha Compute $31.9M non-recourse GPU loan (2026), Alpha Compute release via Nasdaq, read 2026-10-08, Amount: a binding term sheet for a $31.9 million non-recourse loan facility secured by B300 Nvidia graphics processing units
  • Alpha Compute $31.9M non-recourse GPU loan (2026), Alpha Compute release via Nasdaq, read 2026-10-08, Structure: Structure: Non-recourse senior secured loan facility
  • Alpha Compute $31.9M non-recourse GPU loan (2026), Alpha Compute release via Nasdaq, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,650 characters) is silent on this.
  • Alpha Compute $31.9M non-recourse GPU loan (2026), Alpha Compute release via Nasdaq, read 2026-10-08, What secures it: the collateral is strictly limited to the underlying Nvidia GPU assets and the facility's build-out
  • Alpha Compute $31.9M non-recourse GPU loan (2026), Alpha Compute release via Nasdaq, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,650 characters) is silent on this.
  • CoreWeave $2.6B DDTL 5.5 (2026), CoreWeave release, DDTL 5.5, read 2026-10-08, Amount: today announced it has closed its $2.6 billion delayed draw term loan facility
  • CoreWeave $2.6B DDTL 5.5 (2026), CoreWeave release, DDTL 5.5, read 2026-10-08, Structure: it has closed its $2.6 billion delayed draw term loan facility
  • CoreWeave $2.6B DDTL 5.5 (2026), CoreWeave release, DDTL 5.5, read 2026-10-08, Rate or spread, in its words: attracting exceptional investor demand, and priced at SOFR + 5.50%
  • CoreWeave $2.6B DDTL 5.5 (2026), CoreWeave release, DDTL 5.5, read 2026-10-08, What secures it: Facility is backed by a diverse group of leading AI, financial services, and technology customers
  • CoreWeave $2.6B DDTL 5.5 (2026), CoreWeave release, DDTL 5.5, read 2026-10-08, Maturity or tenor, in its words: the DDTL 5.5 Facility carries an approximate five-year maturity while its underlying customer contracts average approximately three years in length
  • CoreWeave $7.5B debt financing facility (2024), CoreWeave release, $7.5B facility, read 2026-10-08, Amount: it has signed a definitive agreement for a $7.5 billion debt financing facility led by funds managed by Blackstone
  • CoreWeave $7.5B debt financing facility (2024), CoreWeave release, $7.5B facility, read 2026-10-08, Structure: a $7.5 billion debt financing facility led by funds managed by Blackstone
  • CoreWeave $7.5B debt financing facility (2024), CoreWeave release, $7.5B facility, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,916 characters) is silent on this.
  • CoreWeave $7.5B debt financing facility (2024), CoreWeave release, $7.5B facility, read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (5,916 characters) is silent on this.
  • CoreWeave $7.5B debt financing facility (2024), CoreWeave release, $7.5B facility, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,916 characters) is silent on this.
  • CoreWeave $7.5B debt financing facility (2024), Blackstone release, CoreWeave $7.5B, read 2026-10-08, Amount: it has signed a definitive agreement for a $7.5 billion debt financing facility led by funds managed by Blackstone
  • CoreWeave $7.5B debt financing facility (2024), Blackstone release, CoreWeave $7.5B, read 2026-10-08, Structure: a $7.5 billion debt financing facility led by funds managed by Blackstone
  • CoreWeave $7.5B debt financing facility (2024), Blackstone release, CoreWeave $7.5B, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,770 characters) is silent on this.
  • CoreWeave $7.5B debt financing facility (2024), Blackstone release, CoreWeave $7.5B, read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (5,770 characters) is silent on this.
  • CoreWeave $7.5B debt financing facility (2024), Blackstone release, CoreWeave $7.5B, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,770 characters) is silent on this.
  • CoreWeave $8.5B DDTL 4.0 (2026), CoreWeave release, DDTL 4.0, read 2026-10-08, Amount: today announced it has closed an $8.5 billion delayed draw term loan facility
  • CoreWeave $8.5B DDTL 4.0 (2026), CoreWeave release, DDTL 4.0, read 2026-10-08, Structure: it has closed an $8.5 billion delayed draw term loan facility
  • CoreWeave $8.5B DDTL 4.0 (2026), CoreWeave release, DDTL 4.0, read 2026-10-08, Rate or spread, in its words: The facility includes a floating rate tranche financed at SOFR + 2.25% and a fixed rate tranche financed at approximately 5.9%.
  • CoreWeave $8.5B DDTL 4.0 (2026), CoreWeave release, DDTL 4.0, read 2026-10-08, What secures it: the first investment-grade rated financing secured by HPC infrastructure and an associated customer contract
  • CoreWeave $8.5B DDTL 4.0 (2026), CoreWeave release, DDTL 4.0, read 2026-10-08, Maturity or tenor, in its words: The DDTL 4.0 Facility matures in March 2032
  • Crusoe $225M credit facility from Upper90 (2025), Crusoe newsroom, Upper90 credit facility, read 2026-10-08, Amount: announced today the closing of an approximately $225 million credit facility for Crusoe
  • Crusoe $225M credit facility from Upper90 (2025), Crusoe newsroom, Upper90 credit facility, read 2026-10-08, Structure: the closing of an approximately $225 million credit facility for Crusoe
  • Crusoe $225M credit facility from Upper90 (2025), Crusoe newsroom, Upper90 credit facility, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (3,162 characters) is silent on this.
  • Crusoe $225M credit facility from Upper90 (2025), Crusoe newsroom, Upper90 credit facility, read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (3,162 characters) is silent on this.
  • Crusoe $225M credit facility from Upper90 (2025), Crusoe newsroom, Upper90 credit facility, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (3,162 characters) is silent on this.
  • Firmus US$10bn debt facility (2026), Firmus newsroom, US$10bn financing, read 2026-10-08, Amount: it has secured a US$10 billion debt financing facility led by funds managed by Blackstone
  • Firmus US$10bn debt facility (2026), Firmus newsroom, US$10bn financing, read 2026-10-08, Structure: it has secured a US$10 billion debt financing facility led by funds managed by Blackstone
  • Firmus US$10bn debt facility (2026), Firmus newsroom, US$10bn financing, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,752 characters) is silent on this.
  • Firmus US$10bn debt facility (2026), Firmus newsroom, US$10bn financing, read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (5,752 characters) is silent on this.
  • Firmus US$10bn debt facility (2026), Firmus newsroom, US$10bn financing, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,752 characters) is silent on this.
  • Fluidstack senior debt facility from Macquarie, Macquarie case page, Fluidstack, read 2026-10-08, Amount: Not addressed: the announcement read on 2026-10-08 (4,265 characters) is silent on this.
  • Fluidstack senior debt facility from Macquarie, Macquarie case page, Fluidstack, read 2026-10-08, Structure: Macquarie structured and closed a senior debt facility for Fluidstack, secured by the GPUs themselves
  • Fluidstack senior debt facility from Macquarie, Macquarie case page, Fluidstack, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (4,265 characters) is silent on this.
  • Fluidstack senior debt facility from Macquarie, Macquarie case page, Fluidstack, read 2026-10-08, What secures it: a senior debt facility for Fluidstack, secured by the GPUs themselves
  • Fluidstack senior debt facility from Macquarie, Macquarie case page, Fluidstack, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (4,265 characters) is silent on this.
  • IREN $3.65bn GPU financing (2026), IREN release, $3.65bn GPU financing, read 2026-10-08, Amount: today announced it has closed a $3.65bn investment-grade GPU financing facility
  • IREN $3.65bn GPU financing (2026), IREN release, $3.65bn GPU financing, read 2026-10-08, Structure: The financing comprises a $2.10bn U.S. private placement at a fixed rate equivalent to SOFR+2.13%
  • IREN $3.65bn GPU financing (2026), IREN release, $3.65bn GPU financing, read 2026-10-08, Rate or spread, in its words: a $1.55bn delayed draw term loan at a floating rate of SOFR+2.25%
  • IREN $3.65bn GPU financing (2026), IREN release, $3.65bn GPU financing, read 2026-10-08, What secures it: The facility is secured against the GPUs and associated contracted cash flows.
  • IREN $3.65bn GPU financing (2026), IREN release, $3.65bn GPU financing, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (6,131 characters) is silent on this.
  • Lambda $1B fixed-rate delayed draw term loan (2026), Lambda release, $1B fixed-rate financing, read 2026-10-08, Amount: today announced the closing of a $1 billion investment-grade, delayed draw term loan
  • Lambda $1B fixed-rate delayed draw term loan (2026), Lambda release, $1B fixed-rate financing, read 2026-10-08, Structure: the closing of a $1 billion investment-grade, delayed draw term loan
  • Lambda $1B fixed-rate delayed draw term loan (2026), Lambda release, $1B fixed-rate financing, read 2026-10-08, Rate or spread, in its words: enabled pricing inside the target pricing range of a 6.78% fixed interest rate
  • Lambda $1B fixed-rate delayed draw term loan (2026), Lambda release, $1B fixed-rate financing, read 2026-10-08, What secures it: Secured by the GPU servers and related infrastructure funded by the Facility and the contracted cash flows
  • Lambda $1B fixed-rate delayed draw term loan (2026), Lambda release, $1B fixed-rate financing, read 2026-10-08, Maturity or tenor, in its words: Facility final maturity of May 30, 2033, with a fully amortizing repayment profile
  • Lambda $1B senior secured credit facility (2026), Lambda release, $1B credit facility, read 2026-10-08, Amount: today announced the closing of a $1 billion syndicated senior secured credit facility
  • Lambda $1B senior secured credit facility (2026), Lambda release, $1B credit facility, read 2026-10-08, Structure: the closing of a $1 billion syndicated senior secured credit facility
  • Lambda $1B senior secured credit facility (2026), Lambda release, $1B credit facility, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (4,403 characters) is silent on this.
  • Lambda $1B senior secured credit facility (2026), Lambda release, $1B credit facility, read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (4,403 characters) is silent on this.
  • Lambda $1B senior secured credit facility (2026), Lambda release, $1B credit facility, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (4,403 characters) is silent on this.
  • Lambda $926M term loan B (2026), Lambda release, $926M term loan B, read 2026-10-08, Amount: today announced the closing of its $926 million senior secured term loan B facility
  • Lambda $926M term loan B (2026), Lambda release, $926M term loan B, read 2026-10-08, Structure: its $926 million senior secured term loan B facility
  • Lambda $926M term loan B (2026), Lambda release, $926M term loan B, read 2026-10-08, Rate or spread, in its words: The Facility was priced at SOFR + 3.00%, and issued at 99.5% of the principal amount.
  • Lambda $926M term loan B (2026), Lambda release, $926M term loan B, read 2026-10-08, What secures it: It is secured by the GPU servers and related infrastructure funded through the transaction and the cash flows those assets generate.
  • Lambda $926M term loan B (2026), Lambda release, $926M term loan B, read 2026-10-08, Maturity or tenor, in its words: The Facility matures December 31, 2030, on a fully amortizing schedule
  • Nebius $775M secured debt facility (2026), Nebius release, first secured debt financing, read 2026-10-08, Amount: it has entered into its first senior secured debt facility for approximately $775 million
  • Nebius $775M secured debt facility (2026), Nebius release, first secured debt financing, read 2026-10-08, Structure: it has entered into its first senior secured debt facility for approximately $775 million
  • Nebius $775M secured debt facility (2026), Nebius release, first secured debt financing, read 2026-10-08, Rate or spread, in its words: The facility matures October 31, 2030, and is priced at SOFR + 2.50%.
  • Nebius $775M secured debt facility (2026), Nebius release, first secured debt financing, read 2026-10-08, What secures it: The vehicle is backed by deployed GPU infrastructure and contracted cash flows from an agreement with an investment-grade customer.
  • Nebius $775M secured debt facility (2026), Nebius release, first secured debt financing, read 2026-10-08, Maturity or tenor, in its words: The facility matures October 31, 2030, and is priced at SOFR + 2.50%.
  • NexGen Cloud $34M facility from USD.AI (2026), NexGen Cloud news, USD.AI facility, read 2026-10-08, Amount: it has provided a $34 million, three-year debt facility to fund the deployment
  • NexGen Cloud $34M facility from USD.AI (2026), NexGen Cloud news, USD.AI facility, read 2026-10-08, Structure: it has provided a $34 million, three-year debt facility to fund the deployment
  • NexGen Cloud $34M facility from USD.AI (2026), NexGen Cloud news, USD.AI facility, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (8,214 characters) is silent on this.
  • NexGen Cloud $34M facility from USD.AI (2026), NexGen Cloud news, USD.AI facility, read 2026-10-08, What secures it: secured by the GPUs and the contractual cashflows they generate
  • NexGen Cloud $34M facility from USD.AI (2026), NexGen Cloud news, USD.AI facility, read 2026-10-08, Maturity or tenor, in its words: The three-year, non-recourse facility will fund large-scale NVIDIA B200 GPU fleet
  • Nscale $1.4bn GPU delayed draw term loan (2026), Nscale release, GPU DDTL, read 2026-10-08, Amount: today announced it has signed a USD $1.4 billion Delayed Draw Term Loan backed by GPUs
  • Nscale $1.4bn GPU delayed draw term loan (2026), Nscale release, GPU DDTL, read 2026-10-08, Structure: it has signed a USD $1.4 billion Delayed Draw Term Loan backed by GPUs
  • Nscale $1.4bn GPU delayed draw term loan (2026), Nscale release, GPU DDTL, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (4,379 characters) is silent on this.
  • Nscale $1.4bn GPU delayed draw term loan (2026), Nscale release, GPU DDTL, read 2026-10-08, What secures it: a USD $1.4 billion Delayed Draw Term Loan backed by GPUs
  • Nscale $1.4bn GPU delayed draw term loan (2026), Nscale release, GPU DDTL, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (4,379 characters) is silent on this.
  • QumulusAI $500M non-recourse facility through USD.AI (2025), QumulusAI release via Newswire, read 2026-10-08, Amount: today announced a $500 million non-recourse financing facility arranged by Permian Labs
  • QumulusAI $500M non-recourse facility through USD.AI (2025), QumulusAI release via Newswire, read 2026-10-08, Structure: a $500 million non-recourse financing facility arranged by Permian Labs and distributed through the USD.AI Protocol
  • QumulusAI $500M non-recourse facility through USD.AI (2025), QumulusAI release via Newswire, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (7,905 characters) is silent on this.
  • QumulusAI $500M non-recourse facility through USD.AI (2025), QumulusAI release via Newswire, read 2026-10-08, What secures it: Permian Labs issues GPU Warehouse Receipt Tokens (GWRTs), and USD.AI serves as the on-chain DeFi protocol that enables those tokens to be used as collateral
  • QumulusAI $500M non-recourse facility through USD.AI (2025), QumulusAI release via Newswire, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (7,905 characters) is silent on this.
  • SharonAI US$356m GPU-backed SPV facility (2026), SharonAI 8-K exhibit 99.1, read 2026-10-08, Amount: its inaugural US$356m committed senior secured, GPU-backed SPV debt facility
  • SharonAI US$356m GPU-backed SPV facility (2026), SharonAI 8-K exhibit 99.1, read 2026-10-08, Structure: its inaugural US$356m committed senior secured, GPU-backed SPV debt facility
  • SharonAI US$356m GPU-backed SPV facility (2026), SharonAI 8-K exhibit 99.1, read 2026-10-08, Rate or spread, in its words: priced at a fixed rate of 9.95%, excluding fees
  • SharonAI US$356m GPU-backed SPV facility (2026), SharonAI 8-K exhibit 99.1, read 2026-10-08, What secures it: The facility will be secured against the GPUs and associated cash flows
  • SharonAI US$356m GPU-backed SPV facility (2026), SharonAI 8-K exhibit 99.1, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (7,198 characters) is silent on this.

Read and excluded

9 named documents were read and left out because they are not what this board covers; each reason is below. They are counted, never answered.

  • TeraWulf (borrower): TeraWulf's $3.2B senior secured notes finance part of a data centre expansion at its Lake Mariner campus, secured on WULF Compute's assets, a Fluidstack lockbox account and warrants pledged by Google; neither the release nor the 8-K exhibit mentions GPUs, so it is not a financing against GPU fleets, which is this register's subject (gpu collateral loans). Controller decision 2026-10-11 on dl-upread-r12's finding.
  • TeraWulf (borrower), 8-K exhibit 99.1: TeraWulf's $3.2B senior secured notes finance part of a data centre expansion at its Lake Mariner campus, secured on WULF Compute's assets, a Fluidstack lockbox account and warrants pledged by Google; neither the release nor the 8-K exhibit mentions GPUs, so it is not a financing against GPU fleets, which is this register's subject (gpu collateral loans). Controller decision 2026-10-11 on dl-upread-r12's finding.
  • Latham & Watkins (lender's counsel): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
  • Davis Polk (borrower's counsel): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
  • Kirkland & Ellis (borrower's counsel): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
  • Morgan Lewis (borrower's counsel): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
  • Milbank (borrower's counsel): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
  • DatacenterDynamics: trade press, not the borrower's, lender's or counsel's own announcement; it reports a maturity (March 2027) that the borrower's release gives as March 2032
  • Proximo: a cookie and login wall: the stored text carries no article
Method

Each financing's own borrowers', lenders' and counsel's own announcements and SEC exhibits were read through estate-fetch and stored whole (sha256 on every row).

For every announcement, five questions were answered from its own words: amount, structure, rate or spread, in its words, what secures it, maturity or tenor, in its words.

Every stated answer carries the sentence it rests on, checked against the stored text; 'not stated' means the announcement read does not address the question.

A financing with several announcements reads 'varies' where they disagree.

16 financings, 17 announcements.

3 named documents wait to be read; they are left out of every count.

Source list (29)
Cite it or embed it

16 GPU-backed financings as the borrower, lender or counsel announced them, with the amount, pricing and security wherever the announcement states them, read 8 October 2026.

Amount, by financing: the facility size as announced, in millions of US dollars 15 of 16, not stated 1 of 16 (16 financings, read 8 October 2026).

Structure, by financing: a credit or debt facility 10 of 16, a delayed draw term loan 4 of 16, a private placement and term loan 1 of 16, a term loan 1 of 16 (16 financings, read 8 October 2026).

Rate or spread, in its words, by financing: not stated 9 of 16, stated 7 of 16 (16 financings, read 8 October 2026).

What secures it, by financing: the GPUs and customer contracts or their cash flows 7 of 16, the GPUs alone 4 of 16, not stated 4 of 16, customer contracts 1 of 16 (16 financings, read 8 October 2026).

Maturity or tenor, in its words, by financing: not stated 10 of 16, stated 6 of 16 (16 financings, read 8 October 2026).

Suggested citation: "GPU-backed loans: the terms borrowers and lenders published", updated 2026-10-08, https://gpucollateralloans.com/datasets/gpu-backed-financing-published-terms/.

Embed code, no JavaScript
16 GPU-backed financings as the borrower, lender or counsel announced them, with the amount, pricing and security wherever the announcement states them, read 8 October 2026.
GPU-backed loans: the terms borrowers and lenders published, gpucollateralloans.com

Raw files: JSON, CSV, Markdown.

Get the CSV (85 answers, compiled 2026-10-08)

Questions this data answers

Who has borrowed against GPU fleets, from whom, how much, at what rate or spread, for how long, and secured on what?

16 GPU-backed financings as the borrower, lender or counsel announced them, with the amount, pricing and security wherever the announcement states them, read 8 October 2026.