GPU-backed loans: the terms borrowers and lenders published
16 GPU-backed financings as the borrower, lender or counsel announced them, with the amount, pricing and security wherever the announcement states them, read 8 October 2026.
Amount
Structure
Rate or spread, in its words
What secures it
Maturity or tenor, in its words
How every financing answered
One financing to a row. Expand an answer for its source sentence, word for word, plus the announcement and the read date; "not stated" means that announcement does not cover the question.
| Financing | Amount | Structure | Rate or spread, in its words | What secures it | Maturity or tenor, in its words |
|---|---|---|---|---|---|
| Alpha Compute $31.9M non-recourse GPU loan (2026) | 31.9 USD million | a credit or debt facility | not statedNot addressed in Alpha Compute release via Nasdaq | the GPUs alone | not statedNot addressed in Alpha Compute release via Nasdaq |
| CoreWeave $2.6B DDTL 5.5 (2026) | 2600 USD million | a delayed draw term loan | attracting exceptional investor demand, and priced at SOFR + 5.50% | customer contracts | the DDTL 5.5 Facility carries an approximate five-year maturity while its underlying… |
| CoreWeave $7.5B debt financing facility (2024) | 7500 USD million | a credit or debt facility | not statedNot addressed in Blackstone release, CoreWeave $7.5B Not addressed in CoreWeave release, $7.5B facility | not statedNot addressed in Blackstone release, CoreWeave $7.5B Not addressed in CoreWeave release, $7.5B facility | not statedNot addressed in Blackstone release, CoreWeave $7.5B Not addressed in CoreWeave release, $7.5B facility |
| CoreWeave $8.5B DDTL 4.0 (2026) | 8500 USD million | a delayed draw term loan | The facility includes a floating rate tranche financed at SOFR + 2.25% and a fixed rate… | the GPUs and customer contracts or their cash flows | The DDTL 4.0 Facility matures in March 2032 |
| Crusoe $225M credit facility from Upper90 (2025) | 225 USD million | a credit or debt facility | not statedNot addressed in Crusoe newsroom, Upper90 credit facility | not statedNot addressed in Crusoe newsroom, Upper90 credit facility | not statedNot addressed in Crusoe newsroom, Upper90 credit facility |
| Firmus US$10bn debt facility (2026) | 10000 USD million | a credit or debt facility | not statedNot addressed in Firmus newsroom, US$10bn financing | not statedNot addressed in Firmus newsroom, US$10bn financing | not statedNot addressed in Firmus newsroom, US$10bn financing |
| Fluidstack senior debt facility from Macquarie | not statedNot addressed in Macquarie case page, Fluidstack | a credit or debt facility | not statedNot addressed in Macquarie case page, Fluidstack | the GPUs alone | not statedNot addressed in Macquarie case page, Fluidstack |
| IREN $3.65bn GPU financing (2026) | 3650 USD million | a private placement and term loan | a $1.55bn delayed draw term loan at a floating rate of SOFR+2.25% | the GPUs and customer contracts or their cash flows | not statedNot addressed in IREN release, $3.65bn GPU financing |
| Lambda $1B fixed-rate delayed draw term loan (2026) | 1000 USD million | a delayed draw term loan | enabled pricing inside the target pricing range of a 6.78% fixed interest rate | the GPUs and customer contracts or their cash flows | Facility final maturity of May 30, 2033, with a fully amortizing repayment profile |
| Lambda $1B senior secured credit facility (2026) | 1000 USD million | a credit or debt facility | not statedNot addressed in Lambda release, $1B credit facility | not statedNot addressed in Lambda release, $1B credit facility | not statedNot addressed in Lambda release, $1B credit facility |
| Lambda $926M term loan B (2026) | 926 USD million | a term loan | The Facility was priced at SOFR + 3.00%, and issued at 99.5% of the principal amount. | the GPUs and customer contracts or their cash flows | The Facility matures December 31, 2030, on a fully amortizing schedule |
| Nebius $775M secured debt facility (2026) | 775 USD million | a credit or debt facility | The facility matures October 31, 2030, and is priced at SOFR + 2.50%. | the GPUs and customer contracts or their cash flows | The facility matures October 31, 2030, and is priced at SOFR + 2.50%. |
| NexGen Cloud $34M facility from USD.AI (2026) | 34 USD million | a credit or debt facility | not statedNot addressed in NexGen Cloud news, USD.AI facility | the GPUs and customer contracts or their cash flows | The three-year, non-recourse facility will fund large-scale NVIDIA B200 GPU fleet |
| Nscale $1.4bn GPU delayed draw term loan (2026) | 1400 USD million | a delayed draw term loan | not statedNot addressed in Nscale release, GPU DDTL | the GPUs alone | not statedNot addressed in Nscale release, GPU DDTL |
| QumulusAI $500M non-recourse facility through USD.AI (2025) | 500 USD million | a credit or debt facility | not statedNot addressed in QumulusAI release via Newswire | the GPUs alone | not statedNot addressed in QumulusAI release via Newswire |
| SharonAI US$356m GPU-backed SPV facility (2026) | 356 USD million | a credit or debt facility | priced at a fixed rate of 9.95%, excluding fees | the GPUs and customer contracts or their cash flows | not statedNot addressed in SharonAI 8-K exhibit 99.1 |
Quoted wording for all 85 answers
- Alpha Compute $31.9M non-recourse GPU loan (2026), Alpha Compute release via Nasdaq, read 2026-10-08, Amount:
a binding term sheet for a $31.9 million non-recourse loan facility secured by B300 Nvidia graphics processing units
- Alpha Compute $31.9M non-recourse GPU loan (2026), Alpha Compute release via Nasdaq, read 2026-10-08, Structure:
Structure: Non-recourse senior secured loan facility
- Alpha Compute $31.9M non-recourse GPU loan (2026), Alpha Compute release via Nasdaq, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,650 characters) is silent on this.
- Alpha Compute $31.9M non-recourse GPU loan (2026), Alpha Compute release via Nasdaq, read 2026-10-08, What secures it:
the collateral is strictly limited to the underlying Nvidia GPU assets and the facility's build-out
- Alpha Compute $31.9M non-recourse GPU loan (2026), Alpha Compute release via Nasdaq, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,650 characters) is silent on this.
- CoreWeave $2.6B DDTL 5.5 (2026), CoreWeave release, DDTL 5.5, read 2026-10-08, Amount:
today announced it has closed its $2.6 billion delayed draw term loan facility
- CoreWeave $2.6B DDTL 5.5 (2026), CoreWeave release, DDTL 5.5, read 2026-10-08, Structure:
it has closed its $2.6 billion delayed draw term loan facility
- CoreWeave $2.6B DDTL 5.5 (2026), CoreWeave release, DDTL 5.5, read 2026-10-08, Rate or spread, in its words:
attracting exceptional investor demand, and priced at SOFR + 5.50%
- CoreWeave $2.6B DDTL 5.5 (2026), CoreWeave release, DDTL 5.5, read 2026-10-08, What secures it:
Facility is backed by a diverse group of leading AI, financial services, and technology customers
- CoreWeave $2.6B DDTL 5.5 (2026), CoreWeave release, DDTL 5.5, read 2026-10-08, Maturity or tenor, in its words:
the DDTL 5.5 Facility carries an approximate five-year maturity while its underlying customer contracts average approximately three years in length
- CoreWeave $7.5B debt financing facility (2024), CoreWeave release, $7.5B facility, read 2026-10-08, Amount:
it has signed a definitive agreement for a $7.5 billion debt financing facility led by funds managed by Blackstone
- CoreWeave $7.5B debt financing facility (2024), CoreWeave release, $7.5B facility, read 2026-10-08, Structure:
a $7.5 billion debt financing facility led by funds managed by Blackstone
- CoreWeave $7.5B debt financing facility (2024), CoreWeave release, $7.5B facility, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,916 characters) is silent on this.
- CoreWeave $7.5B debt financing facility (2024), CoreWeave release, $7.5B facility, read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (5,916 characters) is silent on this.
- CoreWeave $7.5B debt financing facility (2024), CoreWeave release, $7.5B facility, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,916 characters) is silent on this.
- CoreWeave $7.5B debt financing facility (2024), Blackstone release, CoreWeave $7.5B, read 2026-10-08, Amount:
it has signed a definitive agreement for a $7.5 billion debt financing facility led by funds managed by Blackstone
- CoreWeave $7.5B debt financing facility (2024), Blackstone release, CoreWeave $7.5B, read 2026-10-08, Structure:
a $7.5 billion debt financing facility led by funds managed by Blackstone
- CoreWeave $7.5B debt financing facility (2024), Blackstone release, CoreWeave $7.5B, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,770 characters) is silent on this.
- CoreWeave $7.5B debt financing facility (2024), Blackstone release, CoreWeave $7.5B, read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (5,770 characters) is silent on this.
- CoreWeave $7.5B debt financing facility (2024), Blackstone release, CoreWeave $7.5B, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,770 characters) is silent on this.
- CoreWeave $8.5B DDTL 4.0 (2026), CoreWeave release, DDTL 4.0, read 2026-10-08, Amount:
today announced it has closed an $8.5 billion delayed draw term loan facility
- CoreWeave $8.5B DDTL 4.0 (2026), CoreWeave release, DDTL 4.0, read 2026-10-08, Structure:
it has closed an $8.5 billion delayed draw term loan facility
- CoreWeave $8.5B DDTL 4.0 (2026), CoreWeave release, DDTL 4.0, read 2026-10-08, Rate or spread, in its words:
The facility includes a floating rate tranche financed at SOFR + 2.25% and a fixed rate tranche financed at approximately 5.9%.
- CoreWeave $8.5B DDTL 4.0 (2026), CoreWeave release, DDTL 4.0, read 2026-10-08, What secures it:
the first investment-grade rated financing secured by HPC infrastructure and an associated customer contract
- CoreWeave $8.5B DDTL 4.0 (2026), CoreWeave release, DDTL 4.0, read 2026-10-08, Maturity or tenor, in its words:
The DDTL 4.0 Facility matures in March 2032
- Crusoe $225M credit facility from Upper90 (2025), Crusoe newsroom, Upper90 credit facility, read 2026-10-08, Amount:
announced today the closing of an approximately $225 million credit facility for Crusoe
- Crusoe $225M credit facility from Upper90 (2025), Crusoe newsroom, Upper90 credit facility, read 2026-10-08, Structure:
the closing of an approximately $225 million credit facility for Crusoe
- Crusoe $225M credit facility from Upper90 (2025), Crusoe newsroom, Upper90 credit facility, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (3,162 characters) is silent on this.
- Crusoe $225M credit facility from Upper90 (2025), Crusoe newsroom, Upper90 credit facility, read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (3,162 characters) is silent on this.
- Crusoe $225M credit facility from Upper90 (2025), Crusoe newsroom, Upper90 credit facility, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (3,162 characters) is silent on this.
- Firmus US$10bn debt facility (2026), Firmus newsroom, US$10bn financing, read 2026-10-08, Amount:
it has secured a US$10 billion debt financing facility led by funds managed by Blackstone
- Firmus US$10bn debt facility (2026), Firmus newsroom, US$10bn financing, read 2026-10-08, Structure:
it has secured a US$10 billion debt financing facility led by funds managed by Blackstone
- Firmus US$10bn debt facility (2026), Firmus newsroom, US$10bn financing, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,752 characters) is silent on this.
- Firmus US$10bn debt facility (2026), Firmus newsroom, US$10bn financing, read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (5,752 characters) is silent on this.
- Firmus US$10bn debt facility (2026), Firmus newsroom, US$10bn financing, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,752 characters) is silent on this.
- Fluidstack senior debt facility from Macquarie, Macquarie case page, Fluidstack, read 2026-10-08, Amount: Not addressed: the announcement read on 2026-10-08 (4,265 characters) is silent on this.
- Fluidstack senior debt facility from Macquarie, Macquarie case page, Fluidstack, read 2026-10-08, Structure:
Macquarie structured and closed a senior debt facility for Fluidstack, secured by the GPUs themselves
- Fluidstack senior debt facility from Macquarie, Macquarie case page, Fluidstack, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (4,265 characters) is silent on this.
- Fluidstack senior debt facility from Macquarie, Macquarie case page, Fluidstack, read 2026-10-08, What secures it:
a senior debt facility for Fluidstack, secured by the GPUs themselves
- Fluidstack senior debt facility from Macquarie, Macquarie case page, Fluidstack, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (4,265 characters) is silent on this.
- IREN $3.65bn GPU financing (2026), IREN release, $3.65bn GPU financing, read 2026-10-08, Amount:
today announced it has closed a $3.65bn investment-grade GPU financing facility
- IREN $3.65bn GPU financing (2026), IREN release, $3.65bn GPU financing, read 2026-10-08, Structure:
The financing comprises a $2.10bn U.S. private placement at a fixed rate equivalent to SOFR+2.13%
- IREN $3.65bn GPU financing (2026), IREN release, $3.65bn GPU financing, read 2026-10-08, Rate or spread, in its words:
a $1.55bn delayed draw term loan at a floating rate of SOFR+2.25%
- IREN $3.65bn GPU financing (2026), IREN release, $3.65bn GPU financing, read 2026-10-08, What secures it:
The facility is secured against the GPUs and associated contracted cash flows.
- IREN $3.65bn GPU financing (2026), IREN release, $3.65bn GPU financing, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (6,131 characters) is silent on this.
- Lambda $1B fixed-rate delayed draw term loan (2026), Lambda release, $1B fixed-rate financing, read 2026-10-08, Amount:
today announced the closing of a $1 billion investment-grade, delayed draw term loan
- Lambda $1B fixed-rate delayed draw term loan (2026), Lambda release, $1B fixed-rate financing, read 2026-10-08, Structure:
the closing of a $1 billion investment-grade, delayed draw term loan
- Lambda $1B fixed-rate delayed draw term loan (2026), Lambda release, $1B fixed-rate financing, read 2026-10-08, Rate or spread, in its words:
enabled pricing inside the target pricing range of a 6.78% fixed interest rate
- Lambda $1B fixed-rate delayed draw term loan (2026), Lambda release, $1B fixed-rate financing, read 2026-10-08, What secures it:
Secured by the GPU servers and related infrastructure funded by the Facility and the contracted cash flows
- Lambda $1B fixed-rate delayed draw term loan (2026), Lambda release, $1B fixed-rate financing, read 2026-10-08, Maturity or tenor, in its words:
Facility final maturity of May 30, 2033, with a fully amortizing repayment profile
- Lambda $1B senior secured credit facility (2026), Lambda release, $1B credit facility, read 2026-10-08, Amount:
today announced the closing of a $1 billion syndicated senior secured credit facility
- Lambda $1B senior secured credit facility (2026), Lambda release, $1B credit facility, read 2026-10-08, Structure:
the closing of a $1 billion syndicated senior secured credit facility
- Lambda $1B senior secured credit facility (2026), Lambda release, $1B credit facility, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (4,403 characters) is silent on this.
- Lambda $1B senior secured credit facility (2026), Lambda release, $1B credit facility, read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (4,403 characters) is silent on this.
- Lambda $1B senior secured credit facility (2026), Lambda release, $1B credit facility, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (4,403 characters) is silent on this.
- Lambda $926M term loan B (2026), Lambda release, $926M term loan B, read 2026-10-08, Amount:
today announced the closing of its $926 million senior secured term loan B facility
- Lambda $926M term loan B (2026), Lambda release, $926M term loan B, read 2026-10-08, Structure:
its $926 million senior secured term loan B facility
- Lambda $926M term loan B (2026), Lambda release, $926M term loan B, read 2026-10-08, Rate or spread, in its words:
The Facility was priced at SOFR + 3.00%, and issued at 99.5% of the principal amount.
- Lambda $926M term loan B (2026), Lambda release, $926M term loan B, read 2026-10-08, What secures it:
It is secured by the GPU servers and related infrastructure funded through the transaction and the cash flows those assets generate.
- Lambda $926M term loan B (2026), Lambda release, $926M term loan B, read 2026-10-08, Maturity or tenor, in its words:
The Facility matures December 31, 2030, on a fully amortizing schedule
- Nebius $775M secured debt facility (2026), Nebius release, first secured debt financing, read 2026-10-08, Amount:
it has entered into its first senior secured debt facility for approximately $775 million
- Nebius $775M secured debt facility (2026), Nebius release, first secured debt financing, read 2026-10-08, Structure:
it has entered into its first senior secured debt facility for approximately $775 million
- Nebius $775M secured debt facility (2026), Nebius release, first secured debt financing, read 2026-10-08, Rate or spread, in its words:
The facility matures October 31, 2030, and is priced at SOFR + 2.50%.
- Nebius $775M secured debt facility (2026), Nebius release, first secured debt financing, read 2026-10-08, What secures it:
The vehicle is backed by deployed GPU infrastructure and contracted cash flows from an agreement with an investment-grade customer.
- Nebius $775M secured debt facility (2026), Nebius release, first secured debt financing, read 2026-10-08, Maturity or tenor, in its words:
The facility matures October 31, 2030, and is priced at SOFR + 2.50%.
- NexGen Cloud $34M facility from USD.AI (2026), NexGen Cloud news, USD.AI facility, read 2026-10-08, Amount:
it has provided a $34 million, three-year debt facility to fund the deployment
- NexGen Cloud $34M facility from USD.AI (2026), NexGen Cloud news, USD.AI facility, read 2026-10-08, Structure:
it has provided a $34 million, three-year debt facility to fund the deployment
- NexGen Cloud $34M facility from USD.AI (2026), NexGen Cloud news, USD.AI facility, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (8,214 characters) is silent on this.
- NexGen Cloud $34M facility from USD.AI (2026), NexGen Cloud news, USD.AI facility, read 2026-10-08, What secures it:
secured by the GPUs and the contractual cashflows they generate
- NexGen Cloud $34M facility from USD.AI (2026), NexGen Cloud news, USD.AI facility, read 2026-10-08, Maturity or tenor, in its words:
The three-year, non-recourse facility will fund large-scale NVIDIA B200 GPU fleet
- Nscale $1.4bn GPU delayed draw term loan (2026), Nscale release, GPU DDTL, read 2026-10-08, Amount:
today announced it has signed a USD $1.4 billion Delayed Draw Term Loan backed by GPUs
- Nscale $1.4bn GPU delayed draw term loan (2026), Nscale release, GPU DDTL, read 2026-10-08, Structure:
it has signed a USD $1.4 billion Delayed Draw Term Loan backed by GPUs
- Nscale $1.4bn GPU delayed draw term loan (2026), Nscale release, GPU DDTL, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (4,379 characters) is silent on this.
- Nscale $1.4bn GPU delayed draw term loan (2026), Nscale release, GPU DDTL, read 2026-10-08, What secures it:
a USD $1.4 billion Delayed Draw Term Loan backed by GPUs
- Nscale $1.4bn GPU delayed draw term loan (2026), Nscale release, GPU DDTL, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (4,379 characters) is silent on this.
- QumulusAI $500M non-recourse facility through USD.AI (2025), QumulusAI release via Newswire, read 2026-10-08, Amount:
today announced a $500 million non-recourse financing facility arranged by Permian Labs
- QumulusAI $500M non-recourse facility through USD.AI (2025), QumulusAI release via Newswire, read 2026-10-08, Structure:
a $500 million non-recourse financing facility arranged by Permian Labs and distributed through the USD.AI Protocol
- QumulusAI $500M non-recourse facility through USD.AI (2025), QumulusAI release via Newswire, read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (7,905 characters) is silent on this.
- QumulusAI $500M non-recourse facility through USD.AI (2025), QumulusAI release via Newswire, read 2026-10-08, What secures it:
Permian Labs issues GPU Warehouse Receipt Tokens (GWRTs), and USD.AI serves as the on-chain DeFi protocol that enables those tokens to be used as collateral
- QumulusAI $500M non-recourse facility through USD.AI (2025), QumulusAI release via Newswire, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (7,905 characters) is silent on this.
- SharonAI US$356m GPU-backed SPV facility (2026), SharonAI 8-K exhibit 99.1, read 2026-10-08, Amount:
its inaugural US$356m committed senior secured, GPU-backed SPV debt facility
- SharonAI US$356m GPU-backed SPV facility (2026), SharonAI 8-K exhibit 99.1, read 2026-10-08, Structure:
its inaugural US$356m committed senior secured, GPU-backed SPV debt facility
- SharonAI US$356m GPU-backed SPV facility (2026), SharonAI 8-K exhibit 99.1, read 2026-10-08, Rate or spread, in its words:
priced at a fixed rate of 9.95%, excluding fees
- SharonAI US$356m GPU-backed SPV facility (2026), SharonAI 8-K exhibit 99.1, read 2026-10-08, What secures it:
The facility will be secured against the GPUs and associated cash flows
- SharonAI US$356m GPU-backed SPV facility (2026), SharonAI 8-K exhibit 99.1, read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (7,198 characters) is silent on this.
Read and excluded
9 named documents were read and left out because they are not what this board covers; each reason is below. They are counted, never answered.
- TeraWulf (borrower): TeraWulf's $3.2B senior secured notes finance part of a data centre expansion at its Lake Mariner campus, secured on WULF Compute's assets, a Fluidstack lockbox account and warrants pledged by Google; neither the release nor the 8-K exhibit mentions GPUs, so it is not a financing against GPU fleets, which is this register's subject (gpu collateral loans). Controller decision 2026-10-11 on dl-upread-r12's finding.
- TeraWulf (borrower), 8-K exhibit 99.1: TeraWulf's $3.2B senior secured notes finance part of a data centre expansion at its Lake Mariner campus, secured on WULF Compute's assets, a Fluidstack lockbox account and warrants pledged by Google; neither the release nor the 8-K exhibit mentions GPUs, so it is not a financing against GPU fleets, which is this register's subject (gpu collateral loans). Controller decision 2026-10-11 on dl-upread-r12's finding.
- Latham & Watkins (lender's counsel): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
- Davis Polk (borrower's counsel): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
- Kirkland & Ellis (borrower's counsel): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
- Morgan Lewis (borrower's counsel): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
- Milbank (borrower's counsel): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
- DatacenterDynamics: trade press, not the borrower's, lender's or counsel's own announcement; it reports a maturity (March 2027) that the borrower's release gives as March 2032
- Proximo: a cookie and login wall: the stored text carries no article
Method
Each financing's own borrowers', lenders' and counsel's own announcements and SEC exhibits were read through estate-fetch and stored whole (sha256 on every row).
For every announcement, five questions were answered from its own words: amount, structure, rate or spread, in its words, what secures it, maturity or tenor, in its words.
Every stated answer carries the sentence it rests on, checked against the stored text; 'not stated' means the announcement read does not address the question.
A financing with several announcements reads 'varies' where they disagree.
16 financings, 17 announcements.
3 named documents wait to be read; they are left out of every count.
Source list (29)
- Lambda (borrower) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- Lambda (borrower) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- Lambda (borrower) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- CoreWeave (borrower) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- CoreWeave (borrower) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- IREN (borrower) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- Nebius (borrower) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- Crusoe / Upper90 (borrower and lender) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- Macquarie (lender) for Fluidstack (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- Nscale (borrower) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- Firmus (borrower) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- SharonAI (borrower), 8-K exhibit 99.1 (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- TeraWulf (borrower) (read, set aside)
- TeraWulf (borrower), 8-K exhibit 99.1 (read, set aside)
- NexGen Cloud / USD.AI (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- Northern Data (borrower) (not yet read)
- Alpha Compute (borrower) via Nasdaq press release (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- QumulusAI (borrower) via Newswire (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- Blackstone (lender) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- CoreWeave (borrower) (the publisher's borrowers', lenders' and counsel's own announcements and SEC exhibits, cited for reporting)
- Latham & Watkins (lender's counsel) (read, set aside)
- Davis Polk (borrower's counsel) (read, set aside)
- Kirkland & Ellis (borrower's counsel) (read, set aside)
- Morgan Lewis (borrower's counsel) (read, set aside)
- Milbank (borrower's counsel) (read, set aside)
- DatacenterDynamics (read, set aside)
- Lambda via Business Wire (not yet read)
- Proximo (read, set aside)
- the universe, rule 1 (not yet read)
Cite it or embed it
16 GPU-backed financings as the borrower, lender or counsel announced them, with the amount, pricing and security wherever the announcement states them, read 8 October 2026.
Amount, by financing: the facility size as announced, in millions of US dollars 15 of 16, not stated 1 of 16 (16 financings, read 8 October 2026).
Structure, by financing: a credit or debt facility 10 of 16, a delayed draw term loan 4 of 16, a private placement and term loan 1 of 16, a term loan 1 of 16 (16 financings, read 8 October 2026).
Rate or spread, in its words, by financing: not stated 9 of 16, stated 7 of 16 (16 financings, read 8 October 2026).
What secures it, by financing: the GPUs and customer contracts or their cash flows 7 of 16, the GPUs alone 4 of 16, not stated 4 of 16, customer contracts 1 of 16 (16 financings, read 8 October 2026).
Maturity or tenor, in its words, by financing: not stated 10 of 16, stated 6 of 16 (16 financings, read 8 October 2026).
Suggested citation: "GPU-backed loans: the terms borrowers and lenders published", updated 2026-10-08, https://gpucollateralloans.com/datasets/gpu-backed-financing-published-terms/.
Get the CSV (85 answers, compiled 2026-10-08)
Questions this data answers
Who has borrowed against GPU fleets, from whom, how much, at what rate or spread, for how long, and secured on what?
16 GPU-backed financings as the borrower, lender or counsel announced them, with the amount, pricing and security wherever the announcement states them, read 8 October 2026.