# GPU-backed loans: the terms borrowers and lenders published

> 16 GPU-backed financings as the borrower, lender or counsel announced them, with the amount, pricing and security wherever the announcement states them, read 8 October 2026.

GPU Collateral Loans · https://gpucollateralloans.com/datasets/gpu-backed-financing-published-terms/ · computed 2026-10-08

**GPU-backed financings read:** 16 financings (17 announcements read; 29 named).

## The answers, question by question

- **Amount:** the facility size as announced, in millions of US dollars 15, not stated 1
- **Structure:** a credit or debt facility 10, a delayed draw term loan 4, a private placement and term loan 1, a term loan 1
- **Rate or spread, in its words:** not stated 9, stated 7
- **What secures it:** the GPUs and customer contracts or their cash flows 7, the GPUs alone 4, not stated 4, customer contracts 1
- **Maturity or tenor, in its words:** not stated 10, stated 6

## Every financing

| Financing | Amount | Structure | Rate or spread, in its words | What secures it | Maturity or tenor, in its words |
|---|---|---|---|---|---|
| Alpha Compute $31.9M non-recourse GPU loan (2026) | 31.9 USD million | a credit or debt facility | not stated | the GPUs alone | not stated |
| CoreWeave $2.6B DDTL 5.5 (2026) | 2600 USD million | a delayed draw term loan | attracting exceptional investor demand, and priced at SOFR + 5.50% | customer contracts | the DDTL 5.5 Facility carries an approximate five-year maturity while its underlying… |
| CoreWeave $7.5B debt financing facility (2024) | 7500 USD million | a credit or debt facility | not stated | not stated | not stated |
| CoreWeave $8.5B DDTL 4.0 (2026) | 8500 USD million | a delayed draw term loan | The facility includes a floating rate tranche financed at SOFR + 2.25% and a fixed rate… | the GPUs and customer contracts or their cash flows | The DDTL 4.0 Facility matures in March 2032 |
| Crusoe $225M credit facility from Upper90 (2025) | 225 USD million | a credit or debt facility | not stated | not stated | not stated |
| Firmus US$10bn debt facility (2026) | 10000 USD million | a credit or debt facility | not stated | not stated | not stated |
| Fluidstack senior debt facility from Macquarie | not stated | a credit or debt facility | not stated | the GPUs alone | not stated |
| IREN $3.65bn GPU financing (2026) | 3650 USD million | a private placement and term loan | a $1.55bn delayed draw term loan at a floating rate of SOFR+2.25% | the GPUs and customer contracts or their cash flows | not stated |
| Lambda $1B fixed-rate delayed draw term loan (2026) | 1000 USD million | a delayed draw term loan | enabled pricing inside the target pricing range of a 6.78% fixed interest rate | the GPUs and customer contracts or their cash flows | Facility final maturity of May 30, 2033, with a fully amortizing repayment profile |
| Lambda $1B senior secured credit facility (2026) | 1000 USD million | a credit or debt facility | not stated | not stated | not stated |
| Lambda $926M term loan B (2026) | 926 USD million | a term loan | The Facility was priced at SOFR + 3.00%, and issued at 99.5% of the principal amount. | the GPUs and customer contracts or their cash flows | The Facility matures December 31, 2030, on a fully amortizing schedule |
| Nebius $775M secured debt facility (2026) | 775 USD million | a credit or debt facility | The facility matures October 31, 2030, and is priced at SOFR + 2.50%. | the GPUs and customer contracts or their cash flows | The facility matures October 31, 2030, and is priced at SOFR + 2.50%. |
| NexGen Cloud $34M facility from USD.AI (2026) | 34 USD million | a credit or debt facility | not stated | the GPUs and customer contracts or their cash flows | The three-year, non-recourse facility will fund large-scale NVIDIA B200 GPU fleet |
| Nscale $1.4bn GPU delayed draw term loan (2026) | 1400 USD million | a delayed draw term loan | not stated | the GPUs alone | not stated |
| QumulusAI $500M non-recourse facility through USD.AI (2025) | 500 USD million | a credit or debt facility | not stated | the GPUs alone | not stated |
| SharonAI US$356m GPU-backed SPV facility (2026) | 356 USD million | a credit or debt facility | priced at a fixed rate of 9.95%, excluding fees | the GPUs and customer contracts or their cash flows | not stated |

## The sentence each answer rests on (85)

- Alpha Compute $31.9M non-recourse GPU loan (2026), [Alpha Compute release via Nasdaq](https://www.nasdaq.com/press-release/alpha-compute-executes-binding-319-million-non-recourse-gpu-financing-backed-nvidia), read 2026-10-08, Amount: "a binding term sheet for a $31.9 million non-recourse loan facility secured by B300 Nvidia graphics processing units"
- Alpha Compute $31.9M non-recourse GPU loan (2026), [Alpha Compute release via Nasdaq](https://www.nasdaq.com/press-release/alpha-compute-executes-binding-319-million-non-recourse-gpu-financing-backed-nvidia), read 2026-10-08, Structure: "Structure: Non-recourse senior secured loan facility"
- Alpha Compute $31.9M non-recourse GPU loan (2026), [Alpha Compute release via Nasdaq](https://www.nasdaq.com/press-release/alpha-compute-executes-binding-319-million-non-recourse-gpu-financing-backed-nvidia), read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,650 characters) is silent on this.
- Alpha Compute $31.9M non-recourse GPU loan (2026), [Alpha Compute release via Nasdaq](https://www.nasdaq.com/press-release/alpha-compute-executes-binding-319-million-non-recourse-gpu-financing-backed-nvidia), read 2026-10-08, What secures it: "the collateral is strictly limited to the underlying Nvidia GPU assets and the facility's build-out"
- Alpha Compute $31.9M non-recourse GPU loan (2026), [Alpha Compute release via Nasdaq](https://www.nasdaq.com/press-release/alpha-compute-executes-binding-319-million-non-recourse-gpu-financing-backed-nvidia), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,650 characters) is silent on this.
- CoreWeave $2.6B DDTL 5.5 (2026), [CoreWeave release, DDTL 5.5](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-2-6-Billion-Loan-Facility-Expanding-Financing-Flexibility-for-AI-Infrastructure/default.aspx), read 2026-10-08, Amount: "today announced it has closed its $2.6 billion delayed draw term loan facility"
- CoreWeave $2.6B DDTL 5.5 (2026), [CoreWeave release, DDTL 5.5](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-2-6-Billion-Loan-Facility-Expanding-Financing-Flexibility-for-AI-Infrastructure/default.aspx), read 2026-10-08, Structure: "it has closed its $2.6 billion delayed draw term loan facility"
- CoreWeave $2.6B DDTL 5.5 (2026), [CoreWeave release, DDTL 5.5](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-2-6-Billion-Loan-Facility-Expanding-Financing-Flexibility-for-AI-Infrastructure/default.aspx), read 2026-10-08, Rate or spread, in its words: "attracting exceptional investor demand, and priced at SOFR + 5.50%"
- CoreWeave $2.6B DDTL 5.5 (2026), [CoreWeave release, DDTL 5.5](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-2-6-Billion-Loan-Facility-Expanding-Financing-Flexibility-for-AI-Infrastructure/default.aspx), read 2026-10-08, What secures it: "Facility is backed by a diverse group of leading AI, financial services, and technology customers"
- CoreWeave $2.6B DDTL 5.5 (2026), [CoreWeave release, DDTL 5.5](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-2-6-Billion-Loan-Facility-Expanding-Financing-Flexibility-for-AI-Infrastructure/default.aspx), read 2026-10-08, Maturity or tenor, in its words: "the DDTL 5.5 Facility carries an approximate five-year maturity while its underlying customer contracts average approximately three years in length"
- CoreWeave $7.5B debt financing facility (2024), [CoreWeave release, $7.5B facility](https://investors.coreweave.com/news/news-details/2024/CoreWeave-Secures-7-5-Billion-Debt-Financing-Facility-led-by-Blackstone-and-Magnetar/default.aspx), read 2026-10-08, Amount: "it has signed a definitive agreement for a $7.5 billion debt financing facility led by funds managed by Blackstone"
- CoreWeave $7.5B debt financing facility (2024), [CoreWeave release, $7.5B facility](https://investors.coreweave.com/news/news-details/2024/CoreWeave-Secures-7-5-Billion-Debt-Financing-Facility-led-by-Blackstone-and-Magnetar/default.aspx), read 2026-10-08, Structure: "a $7.5 billion debt financing facility led by funds managed by Blackstone"
- CoreWeave $7.5B debt financing facility (2024), [CoreWeave release, $7.5B facility](https://investors.coreweave.com/news/news-details/2024/CoreWeave-Secures-7-5-Billion-Debt-Financing-Facility-led-by-Blackstone-and-Magnetar/default.aspx), read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,916 characters) is silent on this.
- CoreWeave $7.5B debt financing facility (2024), [CoreWeave release, $7.5B facility](https://investors.coreweave.com/news/news-details/2024/CoreWeave-Secures-7-5-Billion-Debt-Financing-Facility-led-by-Blackstone-and-Magnetar/default.aspx), read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (5,916 characters) is silent on this.
- CoreWeave $7.5B debt financing facility (2024), [CoreWeave release, $7.5B facility](https://investors.coreweave.com/news/news-details/2024/CoreWeave-Secures-7-5-Billion-Debt-Financing-Facility-led-by-Blackstone-and-Magnetar/default.aspx), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,916 characters) is silent on this.
- CoreWeave $7.5B debt financing facility (2024), [Blackstone release, CoreWeave $7.5B](https://www.blackstone.com/news/press/coreweave-secures-7-5-billion-debt-financing-facility-led-by-blackstone-and-magnetar/), read 2026-10-08, Amount: "it has signed a definitive agreement for a $7.5 billion debt financing facility led by funds managed by Blackstone"
- CoreWeave $7.5B debt financing facility (2024), [Blackstone release, CoreWeave $7.5B](https://www.blackstone.com/news/press/coreweave-secures-7-5-billion-debt-financing-facility-led-by-blackstone-and-magnetar/), read 2026-10-08, Structure: "a $7.5 billion debt financing facility led by funds managed by Blackstone"
- CoreWeave $7.5B debt financing facility (2024), [Blackstone release, CoreWeave $7.5B](https://www.blackstone.com/news/press/coreweave-secures-7-5-billion-debt-financing-facility-led-by-blackstone-and-magnetar/), read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,770 characters) is silent on this.
- CoreWeave $7.5B debt financing facility (2024), [Blackstone release, CoreWeave $7.5B](https://www.blackstone.com/news/press/coreweave-secures-7-5-billion-debt-financing-facility-led-by-blackstone-and-magnetar/), read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (5,770 characters) is silent on this.
- CoreWeave $7.5B debt financing facility (2024), [Blackstone release, CoreWeave $7.5B](https://www.blackstone.com/news/press/coreweave-secures-7-5-billion-debt-financing-facility-led-by-blackstone-and-magnetar/), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,770 characters) is silent on this.
- CoreWeave $8.5B DDTL 4.0 (2026), [CoreWeave release, DDTL 4.0](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-Landmark-8-5-Billion-Financing-Facility-Achieving-First-Investment-Grade-Rated-GPU-backed-Financing/default.aspx), read 2026-10-08, Amount: "today announced it has closed an $8.5 billion delayed draw term loan facility"
- CoreWeave $8.5B DDTL 4.0 (2026), [CoreWeave release, DDTL 4.0](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-Landmark-8-5-Billion-Financing-Facility-Achieving-First-Investment-Grade-Rated-GPU-backed-Financing/default.aspx), read 2026-10-08, Structure: "it has closed an $8.5 billion delayed draw term loan facility"
- CoreWeave $8.5B DDTL 4.0 (2026), [CoreWeave release, DDTL 4.0](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-Landmark-8-5-Billion-Financing-Facility-Achieving-First-Investment-Grade-Rated-GPU-backed-Financing/default.aspx), read 2026-10-08, Rate or spread, in its words: "The facility includes a floating rate tranche financed at SOFR + 2.25% and a fixed rate tranche financed at approximately 5.9%."
- CoreWeave $8.5B DDTL 4.0 (2026), [CoreWeave release, DDTL 4.0](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-Landmark-8-5-Billion-Financing-Facility-Achieving-First-Investment-Grade-Rated-GPU-backed-Financing/default.aspx), read 2026-10-08, What secures it: "the first investment-grade rated financing secured by HPC infrastructure and an associated customer contract"
- CoreWeave $8.5B DDTL 4.0 (2026), [CoreWeave release, DDTL 4.0](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-Landmark-8-5-Billion-Financing-Facility-Achieving-First-Investment-Grade-Rated-GPU-backed-Financing/default.aspx), read 2026-10-08, Maturity or tenor, in its words: "The DDTL 4.0 Facility matures in March 2032"
- Crusoe $225M credit facility from Upper90 (2025), [Crusoe newsroom, Upper90 credit facility](https://www.crusoe.ai/resources/newsroom/upper90-closes-usd225m-credit-facility-to-crusoe-to-expand-ai-cloud), read 2026-10-08, Amount: "announced today the closing of an approximately $225 million credit facility for Crusoe"
- Crusoe $225M credit facility from Upper90 (2025), [Crusoe newsroom, Upper90 credit facility](https://www.crusoe.ai/resources/newsroom/upper90-closes-usd225m-credit-facility-to-crusoe-to-expand-ai-cloud), read 2026-10-08, Structure: "the closing of an approximately $225 million credit facility for Crusoe"
- Crusoe $225M credit facility from Upper90 (2025), [Crusoe newsroom, Upper90 credit facility](https://www.crusoe.ai/resources/newsroom/upper90-closes-usd225m-credit-facility-to-crusoe-to-expand-ai-cloud), read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (3,162 characters) is silent on this.
- Crusoe $225M credit facility from Upper90 (2025), [Crusoe newsroom, Upper90 credit facility](https://www.crusoe.ai/resources/newsroom/upper90-closes-usd225m-credit-facility-to-crusoe-to-expand-ai-cloud), read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (3,162 characters) is silent on this.
- Crusoe $225M credit facility from Upper90 (2025), [Crusoe newsroom, Upper90 credit facility](https://www.crusoe.ai/resources/newsroom/upper90-closes-usd225m-credit-facility-to-crusoe-to-expand-ai-cloud), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (3,162 characters) is silent on this.
- Firmus US$10bn debt facility (2026), [Firmus newsroom, US$10bn financing](https://firmus.co/newsroom/firmus-secures-us10-billion-financing-led-by-blackstone-and-coatue-to-scale-energy-efficient-ai-infrastructure), read 2026-10-08, Amount: "it has secured a US$10 billion debt financing facility led by funds managed by Blackstone"
- Firmus US$10bn debt facility (2026), [Firmus newsroom, US$10bn financing](https://firmus.co/newsroom/firmus-secures-us10-billion-financing-led-by-blackstone-and-coatue-to-scale-energy-efficient-ai-infrastructure), read 2026-10-08, Structure: "it has secured a US$10 billion debt financing facility led by funds managed by Blackstone"
- Firmus US$10bn debt facility (2026), [Firmus newsroom, US$10bn financing](https://firmus.co/newsroom/firmus-secures-us10-billion-financing-led-by-blackstone-and-coatue-to-scale-energy-efficient-ai-infrastructure), read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (5,752 characters) is silent on this.
- Firmus US$10bn debt facility (2026), [Firmus newsroom, US$10bn financing](https://firmus.co/newsroom/firmus-secures-us10-billion-financing-led-by-blackstone-and-coatue-to-scale-energy-efficient-ai-infrastructure), read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (5,752 characters) is silent on this.
- Firmus US$10bn debt facility (2026), [Firmus newsroom, US$10bn financing](https://firmus.co/newsroom/firmus-secures-us10-billion-financing-led-by-blackstone-and-coatue-to-scale-energy-efficient-ai-infrastructure), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (5,752 characters) is silent on this.
- Fluidstack senior debt facility from Macquarie, [Macquarie case page, Fluidstack](https://www.macquarie.com/us/en/insights/accelerating-investment-in-compute-infrastructure-for-fluidstack-a-leading-ai-cloud-platform.html), read 2026-10-08, Amount: Not addressed: the announcement read on 2026-10-08 (4,265 characters) is silent on this.
- Fluidstack senior debt facility from Macquarie, [Macquarie case page, Fluidstack](https://www.macquarie.com/us/en/insights/accelerating-investment-in-compute-infrastructure-for-fluidstack-a-leading-ai-cloud-platform.html), read 2026-10-08, Structure: "Macquarie structured and closed a senior debt facility for Fluidstack, secured by the GPUs themselves"
- Fluidstack senior debt facility from Macquarie, [Macquarie case page, Fluidstack](https://www.macquarie.com/us/en/insights/accelerating-investment-in-compute-infrastructure-for-fluidstack-a-leading-ai-cloud-platform.html), read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (4,265 characters) is silent on this.
- Fluidstack senior debt facility from Macquarie, [Macquarie case page, Fluidstack](https://www.macquarie.com/us/en/insights/accelerating-investment-in-compute-infrastructure-for-fluidstack-a-leading-ai-cloud-platform.html), read 2026-10-08, What secures it: "a senior debt facility for Fluidstack, secured by the GPUs themselves"
- Fluidstack senior debt facility from Macquarie, [Macquarie case page, Fluidstack](https://www.macquarie.com/us/en/insights/accelerating-investment-in-compute-infrastructure-for-fluidstack-a-leading-ai-cloud-platform.html), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (4,265 characters) is silent on this.
- IREN $3.65bn GPU financing (2026), [IREN release, $3.65bn GPU financing](https://iren.gcs-web.com/news-releases/news-release-details/iren-closes-365bn-investment-grade-gpu-financing), read 2026-10-08, Amount: "today announced it has closed a $3.65bn investment-grade GPU financing facility"
- IREN $3.65bn GPU financing (2026), [IREN release, $3.65bn GPU financing](https://iren.gcs-web.com/news-releases/news-release-details/iren-closes-365bn-investment-grade-gpu-financing), read 2026-10-08, Structure: "The financing comprises a $2.10bn U.S. private placement at a fixed rate equivalent to SOFR+2.13%"
- IREN $3.65bn GPU financing (2026), [IREN release, $3.65bn GPU financing](https://iren.gcs-web.com/news-releases/news-release-details/iren-closes-365bn-investment-grade-gpu-financing), read 2026-10-08, Rate or spread, in its words: "a $1.55bn delayed draw term loan at a floating rate of SOFR+2.25%"
- IREN $3.65bn GPU financing (2026), [IREN release, $3.65bn GPU financing](https://iren.gcs-web.com/news-releases/news-release-details/iren-closes-365bn-investment-grade-gpu-financing), read 2026-10-08, What secures it: "The facility is secured against the GPUs and associated contracted cash flows."
- IREN $3.65bn GPU financing (2026), [IREN release, $3.65bn GPU financing](https://iren.gcs-web.com/news-releases/news-release-details/iren-closes-365bn-investment-grade-gpu-financing), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (6,131 characters) is silent on this.
- Lambda $1B fixed-rate delayed draw term loan (2026), [Lambda release, $1B fixed-rate financing](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-fixed-rate-financing), read 2026-10-08, Amount: "today announced the closing of a $1 billion investment-grade, delayed draw term loan"
- Lambda $1B fixed-rate delayed draw term loan (2026), [Lambda release, $1B fixed-rate financing](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-fixed-rate-financing), read 2026-10-08, Structure: "the closing of a $1 billion investment-grade, delayed draw term loan"
- Lambda $1B fixed-rate delayed draw term loan (2026), [Lambda release, $1B fixed-rate financing](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-fixed-rate-financing), read 2026-10-08, Rate or spread, in its words: "enabled pricing inside the target pricing range of a 6.78% fixed interest rate"
- Lambda $1B fixed-rate delayed draw term loan (2026), [Lambda release, $1B fixed-rate financing](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-fixed-rate-financing), read 2026-10-08, What secures it: "Secured by the GPU servers and related infrastructure funded by the Facility and the contracted cash flows"
- Lambda $1B fixed-rate delayed draw term loan (2026), [Lambda release, $1B fixed-rate financing](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-fixed-rate-financing), read 2026-10-08, Maturity or tenor, in its words: "Facility final maturity of May 30, 2033, with a fully amortizing repayment profile"
- Lambda $1B senior secured credit facility (2026), [Lambda release, $1B credit facility](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-credit-facility), read 2026-10-08, Amount: "today announced the closing of a $1 billion syndicated senior secured credit facility"
- Lambda $1B senior secured credit facility (2026), [Lambda release, $1B credit facility](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-credit-facility), read 2026-10-08, Structure: "the closing of a $1 billion syndicated senior secured credit facility"
- Lambda $1B senior secured credit facility (2026), [Lambda release, $1B credit facility](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-credit-facility), read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (4,403 characters) is silent on this.
- Lambda $1B senior secured credit facility (2026), [Lambda release, $1B credit facility](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-credit-facility), read 2026-10-08, What secures it: Not addressed: the announcement read on 2026-10-08 (4,403 characters) is silent on this.
- Lambda $1B senior secured credit facility (2026), [Lambda release, $1B credit facility](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-credit-facility), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (4,403 characters) is silent on this.
- Lambda $926M term loan B (2026), [Lambda release, $926M term loan B](https://lambda.ai/blog/lambda-closes-926-million-senior-secured-term-loan-b-facility), read 2026-10-08, Amount: "today announced the closing of its $926 million senior secured term loan B facility"
- Lambda $926M term loan B (2026), [Lambda release, $926M term loan B](https://lambda.ai/blog/lambda-closes-926-million-senior-secured-term-loan-b-facility), read 2026-10-08, Structure: "its $926 million senior secured term loan B facility"
- Lambda $926M term loan B (2026), [Lambda release, $926M term loan B](https://lambda.ai/blog/lambda-closes-926-million-senior-secured-term-loan-b-facility), read 2026-10-08, Rate or spread, in its words: "The Facility was priced at SOFR + 3.00%, and issued at 99.5% of the principal amount."
- Lambda $926M term loan B (2026), [Lambda release, $926M term loan B](https://lambda.ai/blog/lambda-closes-926-million-senior-secured-term-loan-b-facility), read 2026-10-08, What secures it: "It is secured by the GPU servers and related infrastructure funded through the transaction and the cash flows those assets generate."
- Lambda $926M term loan B (2026), [Lambda release, $926M term loan B](https://lambda.ai/blog/lambda-closes-926-million-senior-secured-term-loan-b-facility), read 2026-10-08, Maturity or tenor, in its words: "The Facility matures December 31, 2030, on a fully amortizing schedule"
- Nebius $775M secured debt facility (2026), [Nebius release, first secured debt financing](https://nebius.com/newsroom/nebius-raises-775-million-in-first-secured-debt-financing-to-accelerate-global-buildout), read 2026-10-08, Amount: "it has entered into its first senior secured debt facility for approximately $775 million"
- Nebius $775M secured debt facility (2026), [Nebius release, first secured debt financing](https://nebius.com/newsroom/nebius-raises-775-million-in-first-secured-debt-financing-to-accelerate-global-buildout), read 2026-10-08, Structure: "it has entered into its first senior secured debt facility for approximately $775 million"
- Nebius $775M secured debt facility (2026), [Nebius release, first secured debt financing](https://nebius.com/newsroom/nebius-raises-775-million-in-first-secured-debt-financing-to-accelerate-global-buildout), read 2026-10-08, Rate or spread, in its words: "The facility matures October 31, 2030, and is priced at SOFR + 2.50%."
- Nebius $775M secured debt facility (2026), [Nebius release, first secured debt financing](https://nebius.com/newsroom/nebius-raises-775-million-in-first-secured-debt-financing-to-accelerate-global-buildout), read 2026-10-08, What secures it: "The vehicle is backed by deployed GPU infrastructure and contracted cash flows from an agreement with an investment-grade customer."
- Nebius $775M secured debt facility (2026), [Nebius release, first secured debt financing](https://nebius.com/newsroom/nebius-raises-775-million-in-first-secured-debt-financing-to-accelerate-global-buildout), read 2026-10-08, Maturity or tenor, in its words: "The facility matures October 31, 2030, and is priced at SOFR + 2.50%."
- NexGen Cloud $34M facility from USD.AI (2026), [NexGen Cloud news, USD.AI facility](https://www.nexgencloud.com/news/usd.ai-provides-34m-facility-to-finance-nexgen-clouds-gpu-deployment-in-sweden), read 2026-10-08, Amount: "it has provided a $34 million, three-year debt facility to fund the deployment"
- NexGen Cloud $34M facility from USD.AI (2026), [NexGen Cloud news, USD.AI facility](https://www.nexgencloud.com/news/usd.ai-provides-34m-facility-to-finance-nexgen-clouds-gpu-deployment-in-sweden), read 2026-10-08, Structure: "it has provided a $34 million, three-year debt facility to fund the deployment"
- NexGen Cloud $34M facility from USD.AI (2026), [NexGen Cloud news, USD.AI facility](https://www.nexgencloud.com/news/usd.ai-provides-34m-facility-to-finance-nexgen-clouds-gpu-deployment-in-sweden), read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (8,214 characters) is silent on this.
- NexGen Cloud $34M facility from USD.AI (2026), [NexGen Cloud news, USD.AI facility](https://www.nexgencloud.com/news/usd.ai-provides-34m-facility-to-finance-nexgen-clouds-gpu-deployment-in-sweden), read 2026-10-08, What secures it: "secured by the GPUs and the contractual cashflows they generate"
- NexGen Cloud $34M facility from USD.AI (2026), [NexGen Cloud news, USD.AI facility](https://www.nexgencloud.com/news/usd.ai-provides-34m-facility-to-finance-nexgen-clouds-gpu-deployment-in-sweden), read 2026-10-08, Maturity or tenor, in its words: "The three-year, non-recourse facility will fund large-scale NVIDIA B200 GPU fleet"
- Nscale $1.4bn GPU delayed draw term loan (2026), [Nscale release, GPU DDTL](https://nscale.com/press-releases/nscale-signs-1-4bn-delayed-draw-term-loan), read 2026-10-08, Amount: "today announced it has signed a USD $1.4 billion Delayed Draw Term Loan backed by GPUs"
- Nscale $1.4bn GPU delayed draw term loan (2026), [Nscale release, GPU DDTL](https://nscale.com/press-releases/nscale-signs-1-4bn-delayed-draw-term-loan), read 2026-10-08, Structure: "it has signed a USD $1.4 billion Delayed Draw Term Loan backed by GPUs"
- Nscale $1.4bn GPU delayed draw term loan (2026), [Nscale release, GPU DDTL](https://nscale.com/press-releases/nscale-signs-1-4bn-delayed-draw-term-loan), read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (4,379 characters) is silent on this.
- Nscale $1.4bn GPU delayed draw term loan (2026), [Nscale release, GPU DDTL](https://nscale.com/press-releases/nscale-signs-1-4bn-delayed-draw-term-loan), read 2026-10-08, What secures it: "a USD $1.4 billion Delayed Draw Term Loan backed by GPUs"
- Nscale $1.4bn GPU delayed draw term loan (2026), [Nscale release, GPU DDTL](https://nscale.com/press-releases/nscale-signs-1-4bn-delayed-draw-term-loan), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (4,379 characters) is silent on this.
- QumulusAI $500M non-recourse facility through USD.AI (2025), [QumulusAI release via Newswire](https://www.newswire.com/view/content/qumulusai-secures-500m-non-recourse-financing-facility-through-usd-ai-to), read 2026-10-08, Amount: "today announced a $500 million non-recourse financing facility arranged by Permian Labs"
- QumulusAI $500M non-recourse facility through USD.AI (2025), [QumulusAI release via Newswire](https://www.newswire.com/view/content/qumulusai-secures-500m-non-recourse-financing-facility-through-usd-ai-to), read 2026-10-08, Structure: "a $500 million non-recourse financing facility arranged by Permian Labs and distributed through the USD.AI Protocol"
- QumulusAI $500M non-recourse facility through USD.AI (2025), [QumulusAI release via Newswire](https://www.newswire.com/view/content/qumulusai-secures-500m-non-recourse-financing-facility-through-usd-ai-to), read 2026-10-08, Rate or spread, in its words: Not addressed: the announcement read on 2026-10-08 (7,905 characters) is silent on this.
- QumulusAI $500M non-recourse facility through USD.AI (2025), [QumulusAI release via Newswire](https://www.newswire.com/view/content/qumulusai-secures-500m-non-recourse-financing-facility-through-usd-ai-to), read 2026-10-08, What secures it: "Permian Labs issues GPU Warehouse Receipt Tokens (GWRTs), and USD.AI serves as the on-chain DeFi protocol that enables those tokens to be used as collateral"
- QumulusAI $500M non-recourse facility through USD.AI (2025), [QumulusAI release via Newswire](https://www.newswire.com/view/content/qumulusai-secures-500m-non-recourse-financing-facility-through-usd-ai-to), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (7,905 characters) is silent on this.
- SharonAI US$356m GPU-backed SPV facility (2026), [SharonAI 8-K exhibit 99.1](https://www.sec.gov/Archives/edgar/data/0002068385/000149315226045368/ex99-1.htm), read 2026-10-08, Amount: "its inaugural US$356m committed senior secured, GPU-backed SPV debt facility"
- SharonAI US$356m GPU-backed SPV facility (2026), [SharonAI 8-K exhibit 99.1](https://www.sec.gov/Archives/edgar/data/0002068385/000149315226045368/ex99-1.htm), read 2026-10-08, Structure: "its inaugural US$356m committed senior secured, GPU-backed SPV debt facility"
- SharonAI US$356m GPU-backed SPV facility (2026), [SharonAI 8-K exhibit 99.1](https://www.sec.gov/Archives/edgar/data/0002068385/000149315226045368/ex99-1.htm), read 2026-10-08, Rate or spread, in its words: "priced at a fixed rate of 9.95%, excluding fees"
- SharonAI US$356m GPU-backed SPV facility (2026), [SharonAI 8-K exhibit 99.1](https://www.sec.gov/Archives/edgar/data/0002068385/000149315226045368/ex99-1.htm), read 2026-10-08, What secures it: "The facility will be secured against the GPUs and associated cash flows"
- SharonAI US$356m GPU-backed SPV facility (2026), [SharonAI 8-K exhibit 99.1](https://www.sec.gov/Archives/edgar/data/0002068385/000149315226045368/ex99-1.htm), read 2026-10-08, Maturity or tenor, in its words: Not addressed: the announcement read on 2026-10-08 (7,198 characters) is silent on this.

## Read and set aside

- [TeraWulf (borrower)](https://investors.terawulf.com/news-events/press-releases/detail/119/terawulf-inc-announces-pricing-of-3-2-billion-of-senior/): TeraWulf's $3.2B senior secured notes finance part of a data centre expansion at its Lake Mariner campus, secured on WULF Compute's assets, a Fluidstack lockbox account and warrants pledged by Google; neither the release nor the 8-K exhibit mentions GPUs, so it is not a financing against GPU fleets, which is this register's subject (gpu collateral loans). Controller decision 2026-10-11 on dl-upread-r12's finding.
- [TeraWulf (borrower), 8-K exhibit 99.1](https://www.sec.gov/Archives/edgar/data/1083301/000110465925100142/tm2528904d1_ex99-1.htm): TeraWulf's $3.2B senior secured notes finance part of a data centre expansion at its Lake Mariner campus, secured on WULF Compute's assets, a Fluidstack lockbox account and warrants pledged by Google; neither the release nor the 8-K exhibit mentions GPUs, so it is not a financing against GPU fleets, which is this register's subject (gpu collateral loans). Controller decision 2026-10-11 on dl-upread-r12's finding.
- [Latham & Watkins (lender's counsel)](https://www.lw.com/en/news/2024/04/latham-watkins-represents-macquarie-in-us500-million-financing-for-lambda): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
- [Davis Polk (borrower's counsel)](https://www.davispolk.com/experience/lambda-1-billion-senior-secured-credit-facility): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
- [Kirkland & Ellis (borrower's counsel)](https://kirkland.com/news/press-release/2026/03/kirkland-advises-coreweave-on-financing-facility-achieving-first-investmentgrade-gpu-financing): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
- [Morgan Lewis (borrower's counsel)](https://www.morganlewis.com/news/2026/07/morgan-lewis-advises-nebius-group-on-775m-first-secured-debt-financing): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
- [Milbank (borrower's counsel)](https://www.milbank.com/en/news/milbank-advises-firmus-in-landmark-usdollar10b-financing-led-by-blackstone-and-coatue-to-accelerate-energy-efficient-ai-infrastructure.html): the charter admits it for: deal existence, counsel and structure as corroboration; never a party's figure
- [DatacenterDynamics](https://www.datacenterdynamics.com/en/news/coreweave-secures-85bn-loan-for-gpu-purchases/): trade press, not the borrower's, lender's or counsel's own announcement; it reports a maturity (March 2027) that the borrower's release gives as March 2032
- [Proximo](https://www.proximoinfra.com/news/78184/IREN-closes-3-65bn-US-GPU-financing): a cookie and login wall: the stored text carries no article

## Methodology

Each financing's own borrowers', lenders' and counsel's own announcements and SEC exhibits were read through estate-fetch and stored whole (sha256 on every row). For every announcement, five questions were answered from its own words: amount, structure, rate or spread, in its words, what secures it, maturity or tenor, in its words. Every stated answer carries the sentence it rests on, checked against the stored text; 'not stated' means the announcement read does not address the question. A financing with several announcements reads 'varies' where they disagree. 16 financings, 17 announcements.

## Sources

- [Lambda (borrower)](https://lambda.ai/blog/lambda-closes-926-million-senior-secured-term-loan-b-facility) (read)
- [Lambda (borrower)](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-credit-facility) (read)
- [Lambda (borrower)](https://lambda.ai/blog/lambda-closes-1-billion-senior-secured-fixed-rate-financing) (read)
- [CoreWeave (borrower)](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-Landmark-8-5-Billion-Financing-Facility-Achieving-First-Investment-Grade-Rated-GPU-backed-Financing/default.aspx) (read)
- [CoreWeave (borrower)](https://investors.coreweave.com/news/news-details/2026/CoreWeave-Closes-2-6-Billion-Loan-Facility-Expanding-Financing-Flexibility-for-AI-Infrastructure/default.aspx) (read)
- [IREN (borrower)](https://iren.gcs-web.com/news-releases/news-release-details/iren-closes-365bn-investment-grade-gpu-financing) (read)
- [Nebius (borrower)](https://nebius.com/newsroom/nebius-raises-775-million-in-first-secured-debt-financing-to-accelerate-global-buildout) (read)
- [Crusoe / Upper90 (borrower and lender)](https://www.crusoe.ai/resources/newsroom/upper90-closes-usd225m-credit-facility-to-crusoe-to-expand-ai-cloud) (read)
- [Macquarie (lender) for Fluidstack](https://www.macquarie.com/us/en/insights/accelerating-investment-in-compute-infrastructure-for-fluidstack-a-leading-ai-cloud-platform.html) (read)
- [Nscale (borrower)](https://nscale.com/press-releases/nscale-signs-1-4bn-delayed-draw-term-loan) (read)
- [Firmus (borrower)](https://firmus.co/newsroom/firmus-secures-us10-billion-financing-led-by-blackstone-and-coatue-to-scale-energy-efficient-ai-infrastructure) (read)
- [SharonAI (borrower), 8-K exhibit 99.1](https://www.sec.gov/Archives/edgar/data/0002068385/000149315226045368/ex99-1.htm) (read)
- [TeraWulf (borrower)](https://investors.terawulf.com/news-events/press-releases/detail/119/terawulf-inc-announces-pricing-of-3-2-billion-of-senior/) (not-terms)
- [TeraWulf (borrower), 8-K exhibit 99.1](https://www.sec.gov/Archives/edgar/data/1083301/000110465925100142/tm2528904d1_ex99-1.htm) (not-terms)
- [NexGen Cloud / USD.AI](https://www.nexgencloud.com/news/usd.ai-provides-34m-facility-to-finance-nexgen-clouds-gpu-deployment-in-sweden) (read)
- [Northern Data (borrower)](https://northerndata.de/eqs-news-test/northern-data-group-secures-eur-575-million-debt-financing-facility-e0621fcc-en) (unread)
- [Alpha Compute (borrower) via Nasdaq press release](https://www.nasdaq.com/press-release/alpha-compute-executes-binding-319-million-non-recourse-gpu-financing-backed-nvidia) (read)
- [QumulusAI (borrower) via Newswire](https://www.newswire.com/view/content/qumulusai-secures-500m-non-recourse-financing-facility-through-usd-ai-to) (read)
- [Blackstone (lender)](https://www.blackstone.com/news/press/coreweave-secures-7-5-billion-debt-financing-facility-led-by-blackstone-and-magnetar/) (read)
- [CoreWeave (borrower)](https://investors.coreweave.com/news/news-details/2024/CoreWeave-Secures-7-5-Billion-Debt-Financing-Facility-led-by-Blackstone-and-Magnetar/default.aspx) (read)
- [Latham & Watkins (lender's counsel)](https://www.lw.com/en/news/2024/04/latham-watkins-represents-macquarie-in-us500-million-financing-for-lambda) (not-terms)
- [Davis Polk (borrower's counsel)](https://www.davispolk.com/experience/lambda-1-billion-senior-secured-credit-facility) (not-terms)
- [Kirkland & Ellis (borrower's counsel)](https://kirkland.com/news/press-release/2026/03/kirkland-advises-coreweave-on-financing-facility-achieving-first-investmentgrade-gpu-financing) (not-terms)
- [Morgan Lewis (borrower's counsel)](https://www.morganlewis.com/news/2026/07/morgan-lewis-advises-nebius-group-on-775m-first-secured-debt-financing) (not-terms)
- [Milbank (borrower's counsel)](https://www.milbank.com/en/news/milbank-advises-firmus-in-landmark-usdollar10b-financing-led-by-blackstone-and-coatue-to-accelerate-energy-efficient-ai-infrastructure.html) (not-terms)
- [DatacenterDynamics](https://www.datacenterdynamics.com/en/news/coreweave-secures-85bn-loan-for-gpu-purchases/) (not-terms)
- [Lambda via Business Wire](https://www.businesswire.com/news/home/20240402148086/en/Lambda-Announces-$500M-GPU-Backed-Facility-to-Expand-Cloud-for-AI) (unread)
- [Proximo](https://www.proximoinfra.com/news/78184/IREN-closes-3-65bn-US-GPU-financing) (not-terms)
- [the universe, rule 1](https://efts.sec.gov/LATEST/search-index?q=%22GPU%22%20%22delayed%20draw%22) (unread)

## Cite or embed

- 16 GPU-backed financings as the borrower, lender or counsel announced them, with the amount, pricing and security wherever the announcement states them, read 8 October 2026.
- Amount, by financing: the facility size as announced, in millions of US dollars 15 of 16, not stated 1 of 16 (16 financings, read 8 October 2026).
- Structure, by financing: a credit or debt facility 10 of 16, a delayed draw term loan 4 of 16, a private placement and term loan 1 of 16, a term loan 1 of 16 (16 financings, read 8 October 2026).
- Rate or spread, in its words, by financing: not stated 9 of 16, stated 7 of 16 (16 financings, read 8 October 2026).
- What secures it, by financing: the GPUs and customer contracts or their cash flows 7 of 16, the GPUs alone 4 of 16, not stated 4 of 16, customer contracts 1 of 16 (16 financings, read 8 October 2026).
- Maturity or tenor, in its words, by financing: not stated 10 of 16, stated 6 of 16 (16 financings, read 8 October 2026).

Cite as: "GPU-backed loans: the terms borrowers and lenders published", updated 2026-10-08, https://gpucollateralloans.com/datasets/gpu-backed-financing-published-terms/.

CSV: https://gpucollateralloans.com/datasets/gpu-backed-financing-published-terms.csv
JSON: https://gpucollateralloans.com/datasets/gpu-backed-financing-published-terms.json